Invitation to Bid for Preferred Negotiator for Architectural Design
- Career Category: Invitation for Bids
- Location: Phnom Penh
Design Scope
• Includes architecture, structure, mechanical equipment (elevators, air conditioning, plumbing, etc.), electrical (including solar power), communications, etc., but excludes interior design
Site Location and Area
Plot number: 790 with a total land area of 1,172m2 (one thousand one hundred and seventy-two Square meters) located at Bayab village, Phnom Penh Tmey commune, Sen Sok district, Phnom Penh.
Building Scale
- 5 floors above ground, building area of 450m2 +, total floor area of 2,700m2 +
- Commercial facilities& Parking lot on the G floor, offices on the 1st to 4th floors, conference hall on the 5th floor
Design Period: 4 months from the contract date, subject to building permit approval
Contract Scope: Design and Construction Permit Approval
Scope of Work
The selected firm through bidding shall provide the following services (ENG & KHM):
- Conduct site assessments and consultations with GNC.
- Develop conceptual and detailed architectural designs.
- Provide:
- Structural design
- Electrical and lighting design
- Water supply and drainage systems
- Air-conditioning and ventilation plans
- Fire safety and accessibility features
- Deliver:
- 2D drawings and 3D renderings
- Detailed BoQ
- Construction drawings for bidding
- Revise designs based on GNC’s feedback.
- Provide technical assistance during construction bidding if required.
Deliverables
The selected firm through bidding shall provide the following Deliverables (ENG & KHM)::
- Site assessment and requirement report
- Conceptual design (2 options minimum)
- Final architectural and engineering drawings
- 3D visualizations
- Detailed BoQ
- Design narrative and material specification
- Design supervision notes and guidance
All documents must be provided in editable formats (AutoCAD, Excel, Word) and PDF.
Bidder Eligibility
- Qualifications
- Registered architectural firm (Cambodia, Korea, etc.)
- Similar track record
- Joint contracting (consortium) permitted
- Restrictions:
- Restrictions on multiple participation in the same project
- Reasons for exclusion of certain companies, etc.